Soil Washing Plant for remediation of former Steel Mill

  • Location: Italy

  • Capacity: 70 t/h

  • Contaminants: Heavy metals >2900 ppm

  • Requirements: D.Lgs. 152/2006 All.5 Tab.1
    Total chromium 150 mg/kg
    Nickel 120 mg/kg
    Copper 120 mg/kg
    Lead 100 mg/kg

Main product to be remediated is residues from factory buildings and foundation demolition. Clean material is recovered. Silt and clay is disposed in landfill after mechanical dewatering.